By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Tech Consumer JournalTech Consumer JournalTech Consumer Journal
  • News
  • Phones
  • Tablets
  • Wearable
  • Home Tech
  • Streaming
  • More Articles
Reading: After a Near-Perfect Test, NASA’s Artemis 2 Rocket Is Rolling Back to the Garage
Share
Sign In
Notification Show More
Font ResizerAa
Tech Consumer JournalTech Consumer Journal
Font ResizerAa
  • News
  • Phones
  • Tablets
  • Wearable
  • Home Tech
  • Streaming
  • More Articles
Search
  • News
  • Phones
  • Tablets
  • Wearable
  • Home Tech
  • Streaming
  • More Articles
Have an existing account? Sign In
Follow US
  • Contact
  • Blog
  • Complaint
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Tech Consumer Journal > News > After a Near-Perfect Test, NASA’s Artemis 2 Rocket Is Rolling Back to the Garage
News

After a Near-Perfect Test, NASA’s Artemis 2 Rocket Is Rolling Back to the Garage

News Room
Last updated: February 24, 2026 6:31 am
News Room
Share
SHARE

Well, I guess we jinxed it.

One day after NASA completed a wet dress rehearsal for the Artemis 2 mission with no major issues, the Space Launch System (SLS) rocket started acting up again. This time, it wasn’t a hydrogen leak. In an agency statement issued Saturday, NASA said engineers observed interrupted flow of helium to the rocket’s interim cryogenic propulsion stage, which provides propulsion to the Orion spacecraft. Helium is essential to maintaining proper environmental conditions for the stage’s engine and to pressurizing liquid hydrogen and liquid oxygen propellant tanks.

To fix the problem, NASA has to roll SLS and the stacked Orion spacecraft back to the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Cape Canaveral, Florida. Weather permitting, teams will begin the rollback process on Tuesday, according to a Sunday update.

In a Saturday X post, NASA Administrator Jared Isaacman said “this will take the March window out of consideration.” After a near-perfect redo wet dress rehearsal last week, the agency was targeting March 6 as the earliest possible launch date for Artemis 2. Now, it will be lucky if this mission gets off the ground in April.

“I understand people are disappointed by this development,” Isaacman said. “That disappointment is felt most by the team at NASA, who have been working tirelessly to prepare for this great endeavor.”

How did we get here?

The Artemis 2 mission will be the first crewed flight for both SLS and Orion. It will also be the first to send astronauts to the vicinity of the Moon since the Apollo era, and this time, they’re venturing farther into deep space than any have gone before. Its success is critical to NASA’s Artemis program, as it will validate that these spacecraft are capable of carrying crew to the Moon and pave the way for future lunar landings.

The mission’s predecessor, Artemis 1, experienced its fair share of technical issues during the lead-up to launch, too. SLS and Orion rolled back to the VAB three times due to valve issues, hydrogen leaks, and extreme weather, delaying the mission by several months.

Artemis 2 launch preparations got off to a similarly rocky start. During the first wet dress rehearsal—when engineers load the SLS’s core and upper stages with propellants and run through the countdown without firing the boosters—teams discovered a helium leak in the same spot that caused trouble during Artemis 1.

To fix the leak, engineers replaced two seals inside the tail service mast umbilicals on the mobile launcher. These 35-foot-tall (11-meter-tall) structures provide cryogenic propellant lines and electrical cable connections to the SLS core stage. NASA made another go at a wet dress rehearsal on Thursday, and the replacement seals worked beautifully.

There was another issue, however, that spoiled Artemis’s simulated countdown. Continued monitoring of the rocket’s systems revealed a disruption of the flow of helium through its upper stage. The rocket’s upper stage uses liquid hydrogen and liquid oxygen to power the mission once it’s in space.

Launch window, interrupted

NASA engineers believe the issue may be related to a connection point between the rocket and ground equipment, a valve in the upper stage, or a filter in the helium line.

To troubleshoot the issue, engineers need access to a section of the rocket that can’t be accessed safely while SLS is on the launchpad. That’s why NASA needs to roll its Moon rocket back to VAB for a closer look.

While the March launch window is currently out the window (no pun intended), NASA is hoping that by acting fast, there may be a chance for Artemis 2 to lift off in April.

Although NASA’s giant Moon rocket had similar troubles in the lead-up to the Artemis 1 mission, at the time the space agency decided it was still operating within safe limits and went ahead with the launch. This time around, however, a four-person crew will be on board SLS, so there’s a lot more at stake.

Read the full article here

You Might Also Like

Rivian’s R2 Plant Was Struck by a Tornado Weeks Before Crucial Launch

You Have to Watch This Trailer for What Is Basically ‘Hungry Hungry Hippos’ Made Horror

Tim Cook Is Done as CEO of Apple

House Candidate Unveils Plan to Pay Americans Who Face AI Job Displacement

Egyptian Archaeologists Find Perfectly Circular Temple Tied to Ancient Water Cult

Share This Article
Facebook Twitter Copy Link Print
Previous Article Did Meta Just Accidentally Prove Smart Glasses Are a Liability?
Next Article The Second ‘Scream’ Trilogy Originally Went Very Differently
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

248.1kLike
69.1kFollow
134kPin
54.3kFollow

Latest News

What a John Ternus Era Means for Apple
News
Even Team Avatar Wants ‘Legend of Aang’ Back in Theaters, Leaks Be Damned
News
Spirit Airlines Wants a Trump Bailout as Jet Fuel Prices Skyrocket
News
What Footage Could Possibly Be Added to ‘Endgame’ to Make it ‘Critical’ for ‘Avengers: Doomsday’?
News
California Accuses Amazon of Price Fixing
News
NASA Shut Down Voyager 1 Science Instrument After Unexpected Power Drop
News
Shadow Lord’, the Old Ways Aren’t as Over as They Seem
News
Disney’s Recent Layoffs Might Thin Out Your Physical Media Collection
News

You Might also Like

News

Our Visit to the Set of ‘The Mandalorian and Grogu’ Was Pure ‘Star Wars’ Magic

News Room News Room 5 Min Read
News

China’s Biggest Streaming Platform Wants Most of Its New Films to Be AI-Generated

News Room News Room 5 Min Read
News

China Successfully Tests Cable Cutting ROV 11,400 Feet Below Sea Level

News Room News Room 5 Min Read
Tech Consumer JournalTech Consumer Journal
Follow US
2024 © Prices.com LLC. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • For Advertisers
  • Contact
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?