By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Tech Consumer JournalTech Consumer JournalTech Consumer Journal
  • News
  • Phones
  • Tablets
  • Wearable
  • Home Tech
  • Streaming
Reading: Watch Live as NASA’s Artemis 2 Moon Rocket Rolls Out to the Launch Pad 
Share
Sign In
Notification Show More
Font ResizerAa
Tech Consumer JournalTech Consumer Journal
Font ResizerAa
  • News
  • Phones
  • Tablets
  • Wearable
  • Home Tech
  • Streaming
Search
  • News
  • Phones
  • Tablets
  • Wearable
  • Home Tech
  • Streaming
Have an existing account? Sign In
Follow US
  • Contact
  • Blog
  • Complaint
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Tech Consumer Journal > News > Watch Live as NASA’s Artemis 2 Moon Rocket Rolls Out to the Launch Pad 
News

Watch Live as NASA’s Artemis 2 Moon Rocket Rolls Out to the Launch Pad 

News Room
Last updated: January 17, 2026 3:04 am
News Room
Share
SHARE

NASA officials were jittery with excitement as they briefed reporters on the final preparations for Artemis 2 on Friday. This historic mission to slingshot a team of four astronauts around the Moon could lift off in a matter of weeks, and NASA is getting ready to roll the rocket out onto the launchpad.

The agency is targeting no earlier than 7 a.m. ET on Saturday, January 17, to begin rolling the Space Launch System (SLS) rocket and stacked Orion spacecraft from the Vehicle Assembly Building (VAB) to Launch Pad 39B at Kennedy Space Center. The four-mile journey should take between 8 and 10 hours.

“About an hour after we get that first motion, you’ll begin to see this beautiful vehicle cross over the threshold of the VAB and come outside for the world to have a look,” Charlie Blackwell-Thompson, launch director for NASA’s Exploration Ground Systems Program (EGS), said during the briefing.

The agency will begin live coverage of the rollout at 7 a.m. ET, followed by a media event at 9 a.m. ET, when NASA Administrator Jared Isaacman and the Artemis 2 astronauts will answer questions about their mission preparations. Both events will stream via NASA’s YouTube channel.

The long march to lift-off

After SLS crosses the threshold of the VAB, engineers will pause to retract the mobile launcher’s crew access arm, which should take about 45 minutes, according to Blackwell-Thompson. Then, they will begin rolling the vehicle toward the launch pad at just under 1 mile per hour (1.6 km/hr).

Once the rocket is secured on the pad, engineers will establish connections to ground support equipment, run checks to make sure those connections are working properly, and link the rocket to the launch control center. Teams will also power up all integrated systems for the first time to ensure that flight hardware, the mobile launcher, and ground infrastructure are good to go.

The Artemis 2 crew—consisting of NASA’s Reid Wiseman, Victor Glover, and Christina Koch, and Canadian Space Agency astronaut Jeremy Hansen—will then conduct a final walkdown of the emergency egress system at the pad. If this all goes according to plan, NASA will get ready for a wet dress rehearsal on February 2.

During this final test, both SLS and Orion will be powered on, and ground crews will load the rocket with propellant. Engineers will then run a launch countdown without firing the rocket’s boosters, instead rehearsing how to safely drain propellant from the SLS.

This process is tricky, and some technical issues are virtually inevitable. NASA is currently targeting a launch date of February 6, but with only a four-day window between the wet dress rehearsal and that earliest possible launch date, this seems unlikely.

“We need to get through wet dress,” Blackwell-Thompson said when asked about the tight turnaround. “We need to see what lessons that we learn as a result of that, and that will ultimately lay out our path toward launch.”

Launch timing remains uncertain

If Artemis 2 isn’t ready to launch by February 6, there are subsequent launch opportunities on February 7, 8, 10, and 11. After that, the next opportunities are March 6, 7, 8, 9, and 11, followed by April 1, 3, 4, 5, 6, and 30.

If the mission gets pushed back even further than that—which is unlikely, but possible—Blackwell-Thompson said there are additional launch opportunities “in just about every month” after April.

During the briefing, she and her colleagues stressed that NASA’s number one priority is crew safety and said they are not in any rush to get Artemis 2 off the ground. With that said, the agency is under pressure to launch this mission expediently.

As the first crewed mission of NASA’s lunar exploration program, Artemis 2 will serve as a critical stepping stone to the Artemis 3 Moon landing. The U.S. is racing against China to accomplish this feat, and with Artemis 2 already years behind schedule, NASA has been pushing full steam ahead toward a 2026 launch.

But this mission is more than just a test flight. The Artemis 2 astronauts will journey farther into space than any have gone before, observe parts of the Moon no human has ever laid eyes on, and prove that humanity is ready to return to deep space. You won’t want to miss it.

Read the full article here

You Might Also Like

Sony and Netflix Will Keep Being Streaming Buddies

Terrifying Photo from the Minneapolis ICE Protests Will Have You Shopping for Leicas

The Gathering’ and Secret Lair

Report Shows Massive Increase in Iranian Bitcoin Adoption Amid Nationwide Unrest

The Wacky Musk-OpenAI Legal War Now Involves a Fittingly Insane Amount of Money

Share This Article
Facebook Twitter Copy Link Print
Previous Article George R.R. Martin Will Either Finish ‘The Winds of Winter’ or Die Trying
Next Article OpenAI Launches Cheaper Subscriptions, Starts Testing Ads Because It’s Time to Pay the Piper
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

248.1kLike
69.1kFollow
134kPin
54.3kFollow

Latest News

We Finally Know Real Things About the Next J.J. Abrams Movie
News
Netflix Will Keep Warner Bros. Movies in Theaters for 45 Days
News
The New ‘Exorcist’ and ‘Paranormal Activity’ Will Haunt Your 2027
News
The Atari Hotel in Las Vegas Isn’t Happening Anymore
News
A Good Vacuum That Tries to Do Too Much
News
Should I Invest in SpaceX?
News
Scientists Discover 2000-Year-Old Mummified Cheetah in an Unexpected Place
News
Lucasfilm Tried to Make an Animated ‘Indiana Jones’ Show
News

You Might also Like

News

Elon Musk Is Really Mad That Ryanair’s CEO Doesn’t Want Starlink on His Planes

News Room News Room 6 Min Read
News

The Best Videos of ICE Busting Their Asses in the Brutal Minneapolis Winter

News Room News Room 11 Min Read
News

Satellites Capture the Hidden World Beneath Antarctica’s Ice

News Room News Room 3 Min Read
Tech Consumer JournalTech Consumer Journal
Follow US
2024 © Prices.com LLC. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • For Advertisers
  • Contact
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?